BSI has begun work on the Boston Water and Sewer Commision – Sewer and Drain Condition Monitoring project. The project includes cleaning and inspecting approximately 30 miles of storm drain and sewer mains ranging in size from 6-inch to 48-inch on roughly one hundred twenty five street located throughout the city of Boston. BSI is utilizing SCREAM CCTV coding software meeting BWSC standards.